All High School Gym Floor Refinishing. (Cost $79,993)
The Parma High School Gym was the last of the three High School Gyms to be refinished. Refinished last in the 1970’s, areas of the floor was showing wear and wood damage. The damaged wood areas was a result of termites. The termites were eliminated in the Summer of 2006, and various floor boards have been replaced and the floor completely refinished with artwork during the Summer of 2007.